Fire safety design and documentation
We prepare fire safety design documentation for new buildings and alterations, from family homes to complex industrial facilities. From the fire safety concept through to detailed design, we work with the architect and other design disciplines.
Who we work with
For clients, developers, architects and lead designers planning new construction, extensions or alterations to existing buildings.
What the work delivers
- An agreed fire safety concept
- A summary of the design basis reflecting the building’s use, the selected solutions and questions that still need clarification.
- Fire safety documentation for the required stage
- Technical descriptions, calculations and drawings for the agreed scope and level of detail.
- Clear multidisciplinary interfaces
- A record of the fire safety decisions, information requirements and responsibilities affecting architectural, structural, mechanical and electrical designs.
Building fire safety design starts with how the building will be used
A residential building, an office and a production hall raise different fire safety design questions. We first establish what will happen in the building, who will use it and what changes the client is preparing. The relationships between rooms, storage arrangements, circulation routes and opportunities for future expansion together shape the task.
The fire safety designer connects these requirements to the architectural and specialist designs. We review the relationships between evacuation, limiting fire spread, structural arrangements and fixed systems. Early coordination allows alternatives to be compared, such as a different layout or circulation connection. Detailed design can then proceed from an agreed basis.
Fire safety concepts, permit and detailed design documentation
At concept stage, we clarify decisions affecting the building as a whole and establish the direction for further design. Fire safety documentation for the permit stage describes the arrangement selected at that point. Detailed design involves developing it further and coordinating the information needed for construction; it is more than a reissue of the same description.
The fire safety technical description explains the proposed solutions in writing. Drawings and calculations supplement the design package according to the task. We therefore define a commission by more than a document title: we identify the design stage, the affected part of the building, the deliverables and the coordination involved. This gives the client and the design team a shared understanding of what the completed package will provide.
Fire safety documentation for alterations to an existing building
For an extension or change of use, we review previous drawings alongside the current use and proposed work. An old document alone does not establish what was actually built. We identify the information that can form the design basis and any matters requiring site confirmation or further records.
Altering a tenant’s premises and refurbishing an entire building involve different scopes of work. The affected area may connect to shared circulation routes, escape routes or existing systems. Distinguishing the parts that will change from those that will remain helps define the boundaries of the task. If assessing an arrangement calls for a separate fire safety expert review, we also agree the question that review will address and its scope.
Working with the fire safety engineer and the wider design team
Fire safety design decisions appear in the documents of several disciplines. We clarify who develops each detail, what information they need and which drawing revision is being discussed. A layout change may affect evacuation; a mechanical design change may affect smoke and heat exhaust arrangements. We define the scope of any related system design or simulation as a separate task.
You can contact our Budapest office while your project is still being prepared. In the quote request, describe its purpose and current stage; technical details that are not yet known can be discussed later. If you need BIM coordination, several design stages or phased deliveries, it is helpful to identify these requirements at the outset.
Questions before you start
What determines the fee for fire safety design?
The size and use of the building, the design stages requested, the complexity of the task, the existing documentation and the coordination involved. BIM requirements or work delivered in phases also need clarification. We prepare a project-specific quotation from this information.
Which floor area should I enter in the quote request?
Enter the combined net floor area of all storeys affected by the design work. Do not multiply that total by the number of storeys again. Above-ground storeys and basement levels are separate project details.
Can I request a fire safety design quote before the architectural plans are complete?
Yes. We can begin with the location, intended use, approximate size and purpose of the project. Identify uncertain information as provisional; we will clarify missing inputs and the work that can be included in the quotation together.
Does the fire safety design package include fire alarm and suppression system drawings?
The building’s fire safety arrangements and the design of fixed systems are connected but involve separate design packages. The quotation will identify which system designs and coordination tasks are included in the commission.
Let’s discuss your project.
Tell us where the project stands and what decision you need to make. The quote request helps you organise the available information.